

FEMA installed air conditioner. Installed after roof air conditioner failed. Cardboard and duct tape provided by FEMA maintenance.
Like this:
Be the first to like this post.
This entry was posted on March 31, 2009 at 8:04 AM and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.